Tags Cost overruns

Tag: cost overruns

Switzerland’s F-35 Controversy: Neutrality, Sovereignty, and Defense Modernization

In Switzerland, a nation synonymous with neutrality and fiscal conservatism, significant public and political opposition is mounting...

Most Read

FAA Nationwide Ground Stop Disrupts Nearly 10,000 Flights

A communications failure at US air traffic control centres forced a nationwide grounding of flights. Although the FAA lifted the restriction after four hours, nearly 10,000 flights had been cancelled and tens of thousands of passengers were affected.

MQ-9B Drone: ISR and Defence Capabilities for Europe

General Atomics is positioning its MQ-9B uncrewed aircraft as a multi-mission platform for European defence, combining persistent surveillance, airborne early warning, counter-drone potential and long-range weapons integration.

Optics11 Underwater Surveillance Expands to Global Navies

Dutch defence technology company Optics11 is expanding its underwater surveillance business, with dozens of navies exploring its fibre-optic sensing systems. The company expects around 35 paid naval trials this year and is preparing for further international expansion.

France IRIS Satellites: €1.5 Billion Military Deal

France has awarded Airbus and Thales Alenia Space a contract worth more than €1.5 billion to develop two advanced IRIS military imaging satellites, ensuring the continuity of its sovereign space-based intelligence capabilities beyond 2035.